Home     The Past     Locals     Sk8 spots     Demos     Links

DK Rating:  Design C- / Construction B / Finish C+

3 October 2001

Mil1.jpg (118096 bytes)

Mil2.jpg (115497 bytes)

Mil3.jpg (115500 bytes)

Mil4.jpg (108928 bytes)

 

14 October 2001

Mil5.jpg (143680 bytes)

Mil8.jpg (138112 bytes)

Mil7.JPG (138429 bytes)

Mil9.jpg (118220 bytes)

Mil10.jpg (99035 bytes)

Mil6.JPG (120255 bytes)

 

25 October 2001

Mila.jpg (88697 bytes)

Milb.jpg (123314 bytes)

Milc.jpg (128815 bytes)

Mild.jpg (141930 bytes)

Mile.jpg (127048 bytes)

Milf.jpg (125207 bytes)

Milg.jpg (124541 bytes)

Milh.jpg (130209 bytes)

Mili.jpg (125270 bytes)

Milj.jpg (125486 bytes)

 

19 November 2001

Milisign.jpg (156725 bytes)

Mili10.jpg (159690 bytes)

Mili1.jpg (105514 bytes)

Mili11.jpg (123400 bytes)

Mili12.jpg (117217 bytes)

Mili13.jpg (112219 bytes)

Mili14.jpg (121296 bytes)

Mili2.jpg (111959 bytes)

Mili3.jpg (102240 bytes)

Mili4.jpg (125032 bytes)

Mili5.jpg (162768 bytes)

Mili6.jpg (176185 bytes)

Mili7.jpg (88126 bytes)

Mili8.jpg (96482 bytes)

Mili9.jpg (165428 bytes)

 

28 November 2001

Milil1.jpg (77961 bytes)

Milil5.jpg (72914 bytes)

Milil2.jpg (103820 bytes)

Milil3.jpg (128221 bytes)

Milil4.jpg (85868 bytes)

Milil6.jpg (80120 bytes)

Milil9.jpg (87672 bytes)

Milil7.jpg (64397 bytes)

Milil8.jpg (108695 bytes)

Milil10.jpg (140059 bytes)

Milil11.jpg (84928 bytes)

Milil13.jpg (72059 bytes)

Talking with supervisor.. he estimated completion by End November. My concern about the design I believe will stay true...steep angles with abrupt transitions into the flat bottom.  Also the architects are going over board.. making the concrete way to hard to work with (fiber-crete plus hardening additives) and not allowing the contractor to be able to trowel the concrete to a super smooth finish...expect this one to be smooth, with some decent lines but some obstacles not as functional as could have been and the surface will probably be a little lumpy, imperfect in some spots, white and chalky.